Douglas XSB2D-1 & BTD-1 Destroyer
Product code 0942612302
Douglas
Series Naval Fighters Number 30
Publisher/Brand Ginter
Author Bob Kowalski & Steve Ginter
Format a4
No. Pages 48
Version Soft cover
Language English
Category Aviationbooks
Subcategory X-Planes » X-Planes USA
Availability only 2 remaining
This product was added to our database on Saturday 1 January 2000.
Your reliable Aviation Book Source since 1989
Also in this series:
| Product | Publisher/Brand | Series/scale | Price € | ||
|---|---|---|---|---|---|
![]() | Curtiss SC1/2 Sea hawk | Ginter | Naval Fighters Number 38 | € 24.72 | |
![]() | Douglas F5D-1 SkylancerTemporarily Out of Stock. | Ginter | Naval Fighters Number 35 | € 9.13 | |
![]() | Fairchild R4Q / C-119 "Packet" / "Flying Boxcar" (US Navy and US Marines) (RESTOCK) | Ginter | Naval Fighters Number 117 | € 22.89 | |
![]() | Grumman F6F Hellcat | Ginter | Naval Fighters Number 92 | € 39.40 | |
![]() | Grumman F9F Panther part three: Navy Panthers: Korea and Beyond | Ginter | Naval Fighters Number 61 | € 27.48 | |
![]() | Grumman J4F-1/2 Widgeon/GoslingTemporarily Out of Stock. | Ginter | Naval Fighters Number 123 | € 21.06 | |
| Grumman S2F/S-2 Tracker and WF-2/E-1B Tracer Part TwoTemporarily Out of Stock. | Ginter | Naval Fighters Number 102 | € 41.24 | ||
| Grumman S2F/S2 Tracker Part One : Development, | Ginter | Naval Fighters Number 101 | € 39.40 | ||
![]() | Lockheed R6V ConstitutionTemporarily Out of Stock. | Ginter | Naval Fighters Number 83 | € 16.47 | |
![]() | McDonnell F2H-3/4 "Big Banjo" Banshee | Ginter | Naval Fighters Number 91 | € 32.06 |
Bob Kowalski continues the saga of the bomber Torpedo (BT) program and the similar Scout Bomber (SB) program with the obscure story of the Douglas XSB2D-1 and BTD-1 "Destroyer".
The United States was still at peace when the Navy issued a requirement for a design to serve with the fleet as both a successor to the SBD, which would be nearing obsolescence, and as a possible replacement for the SB2C, which was undergoing what can charitably be called a prolonged proportional development period. To meet this requirement, two prototypes of the SXB2D-1 were ordered by the Navy on 30 June 1941
75-B&W PHOTO, 15-PAGES DRAWINGS









