
Mo | 5 May | Closed: Liberation Day |
Th | 29 May | Closed: Ascension Day |
Mo | 9 June | Closed: Whit Monday |
Collect Megapoints for Megavouchers
Read the conditions...
Aviation Megastore offers unique Hold & Store service © for internet customers that wish to combine several individual orders to one single shipment, reducing the overall shipping cost significantly.
Read more...
Series Naval Fighters Number 39
Publisher/Brand Ginter
Author Ginter Steve
Format a4
No. Pages 73
Version Soft cover
Language English
Category Aviationbooks
Subcategory X-Planes » X-Planes USA
Availability only 1 remaining
This product was added to our database on Saturday 1 January 2000.
Your reliable Aviation Book Source since 1989
product | Publisher/Brand | Series/scale | Price € | ||
![]() | Convair, T29, R4Y/C131, CC109 | Ginter | Naval Fighters Number 14 | € 15.55 | |
![]() | Curtiss F9C Sparrowhawk, Airship Fighters | Ginter | Naval Fighters Number 79 | € 15.55 | |
![]() | Curtiss Model 98 XBTC-2 " Eggbeater" | Ginter | Naval Fighters Number 77 | € 10.96 | |
![]() | Douglas A4E/F Skyhawk in Navy Service | Ginter | Naval Fighters Number 51 | € 22.89 | |
![]() | Douglas AD/A-1 Skyraider Part Two : US Navy Squadrons | Ginter | Naval Fighters Number 99 | € 45.83 | |
![]() | Fairchild R4Q / C-119 "Packet" / "Flying Boxcar" (US Navy and US Marines) (RESTOCK) | Ginter | Naval Fighters Number 117 | € 22.89 | |
![]() | Kaman Synchrocopter HTK-1/TH-43E, HOK-1/OH-43D, HUK-1/UH-43C Husky | Ginter | Naval Fighters Number 120 | € 26.56 | |
![]() | North American QF86E/F/H Sabre | Ginter | Naval Fighters Number 58 | € 16.47 | |
![]() | Sikorsky HR2S-1/CH37C Deuce, H37A/CH37B Mojave Heavy-Lift Helicopter | Ginter | Naval Fighters Number 107 | € 33.90 | |
![]() | Vought SB2U Vindicator | Ginter | Naval Fighters Number 106 | € 39.40 |
For more than two years prior to the Navy issuing RFP (Request for Proposal) in 1964, Convair engineers had been evaluating designs for use in the limited war and counter-insurgency arenas. These designs were evaluated by many military and civilian representatives of the armed forces and Department of Defense. Shortly after the Navy issued a procurement invitation on 28 October 1963, the design was formalized. Once approved, it only took 40 weeks from go-ahead until first flight on 29 November 1964. Even though a prototype was flying shortly after the requirement was published, North American won the contract with a paper airplane
95-B&W PHOTOS, 32-PAGES DRAWINGS