Douglas XSB2D-1 & BTD-1 Destroyer
Product code 0942612302
Douglas
Series Naval Fighters Number 30
Publisher/Brand Ginter
Author Bob Kowalski & Steve Ginter
Format a4
No. Pages 48
Version Soft cover
Language English
Category Aviationbooks
Subcategory X-Planes » X-Planes USA
Availability only 2 remaining
This product was added to our database on Saturday 1 January 2000.
Your reliable Aviation Book Source since 1989
Also in this series:
| Product | Publisher/Brand | Series/scale | Price € | ||
|---|---|---|---|---|---|
![]() | Boeing XF8B-1 Five in one fighterTemporarily Out of Stock. | Ginter | Naval Fighters Number 65 | € 12.80 | |
![]() | Boeing XPBB-1 Sea Ranger / Lone RangerTemporarily Out of Stock. | Ginter | Naval Fighters Number 124 | € 18.30 | |
![]() | Brewster F2A Buffalo and export variants | Ginter | Naval Fighters Number 104 | € 30.23 | |
![]() | Curtiss Model 98 XBTC-2 " Eggbeater"Temporarily Out of Stock. | Ginter | Naval Fighters Number 77 | € 10.96 | |
![]() | Curtiss SOC Seagull | Ginter | Naval Fighters Number 89 | € 22.89 | |
![]() | F11F-1F Supertiger: Grumman`s Mach-2 InternationalTemporarily Out of Stock. | Ginter | Naval Fighters Number 44 | € 10.96 | |
![]() | Lockheed R6V ConstitutionTemporarily Out of Stock. | Ginter | Naval Fighters Number 83 | € 16.47 | |
![]() | North American FJ-2/-3 FuryTemporarily Out of Stock. | Ginter | Naval Fighters Number 88 | € 36.65 | |
![]() | Temco TT1 PintoTemporarily Out of Stock. | Ginter | Naval Fighters Number 72 | € 15.55 | |
![]() | USN/USMC Two seat Skyhawks (TA-4F, | Ginter | Naval Fighters Number 82 | € 27.48 |
Bob Kowalski continues the saga of the bomber Torpedo (BT) program and the similar Scout Bomber (SB) program with the obscure story of the Douglas XSB2D-1 and BTD-1 "Destroyer".
The United States was still at peace when the Navy issued a requirement for a design to serve with the fleet as both a successor to the SBD, which would be nearing obsolescence, and as a possible replacement for the SB2C, which was undergoing what can charitably be called a prolonged proportional development period. To meet this requirement, two prototypes of the SXB2D-1 were ordered by the Navy on 30 June 1941
75-B&W PHOTO, 15-PAGES DRAWINGS











