Dassault Mirage 50EV/M conversion set(Kinetic)
Product code VMKC48011
Dassault
Scale 1 : 48
Publisher/Brand Vespa Model kits
Version Resin
Category Scale Modelling Kits
Subcategory Scale Modelling Kits » Model Conversion
Availability only 3 remaining
This product was added to our database on Monday 17 february 2025.
Your reliable Aircraft Modelling Source since 1989
Mind: this product is a conversion set used to convert or adapt a scalemodel. The scalemodel is not included and needs to be ordered separately.
This conversion set includes 14 high quality 3D designed, cast resin parts to convert Kinetic Mirage III 1/48 scale kits into a Mirage 50EV/M aircraft operated by the Fuerza Aérea de Peru (Peruvian Air Force) during the nineties and early 2000s.


