Douglas XSB2D-1 & BTD-1 Destroyer
Product code 0942612302
Douglas
Series Naval Fighters Number 30
Publisher/Brand Ginter
Author Bob Kowalski & Steve Ginter
Format a4
No. Pages 48
Version Soft cover
Language English
Category Aviationbooks
Subcategory X-Planes » X-Planes USA
Availability only 2 remaining
This product was added to our database on Saturday 1 January 2000.
Your reliable Aviation Book Source since 1989
Also in this series:
| Product | Publisher/Brand | Series/scale | Price € | ||
|---|---|---|---|---|---|
![]() | Consolidated PB4Y-1/1 Liberator | Ginter | Naval Fighters Number 105 | € 41.24 | |
![]() | Curtiss XBT2C-1 Bomber-Torpedo Aircraft PrototypeTemporarily Out of Stock. | Ginter | Naval Fighters Number 62 | € 15.55 | |
![]() | Curtiss XF15C-1 "Stingaree"Temporarily Out of Stock. | Ginter | Naval Fighters Number 119 | € 15.55 | |
![]() | Douglas A4C/L Skyhawk In Navy Service | Ginter | Naval Fighters Number 109 | € 33.90 | |
![]() | Douglas R4D-8/C-117D Super Gooney.Temporarily Out of Stock. | Ginter | Naval Fighters Number 95 | € 27.48 | |
![]() | Early Banshees', | Ginter | Naval Fighters Number 73 | € 27.48 | |
![]() | Grumman F9F Panther part three: Navy Panthers: Korea and Beyond | Ginter | Naval Fighters Number 61 | € 27.48 | |
![]() | Piasecki HRP-1/2 "Rescuer" (Expected end of May 2026)Expected | Ginter | Naval Fighters Number 126 | € 22.89 | |
![]() | Temco TT1 Pinto | Ginter | Naval Fighters Number 72 | € 15.55 | |
![]() | The Forgotten Bell HSL-1: US Navy's First All-Weather Anti-Submarine Warfare Helicopter | Ginter | Naval Fighters Number 70 | € 16.47 |
Bob Kowalski continues the saga of the bomber Torpedo (BT) program and the similar Scout Bomber (SB) program with the obscure story of the Douglas XSB2D-1 and BTD-1 "Destroyer".
The United States was still at peace when the Navy issued a requirement for a design to serve with the fleet as both a successor to the SBD, which would be nearing obsolescence, and as a possible replacement for the SB2C, which was undergoing what can charitably be called a prolonged proportional development period. To meet this requirement, two prototypes of the SXB2D-1 were ordered by the Navy on 30 June 1941
75-B&W PHOTO, 15-PAGES DRAWINGS











